: SR Hazlehurst, LLC : C011478
: 6022 : 1331073
: : 7/15/2022
:
Generation Assets
ID Filing Entity
and its Energy Affiliates
Docket Number
Where MBR Granted
Generation
Name
Owned
By
Controlled
By
Date Control
Transferred
Market / Balancing
Authority Area
Geographic
Region
In-Service
Date
Plant Code Generator ID Unit Code Amount Attributed to
Entity and Affiliates
Capacity Rating
Used in Filing (MW)
Capacity Rating Methodology Used:
Nameplate, Seasonal, 5-yr Unit,
5-yr EIA, Alternative
End Note Number
(Enter text in End Note Tab)
SR Hazlehurst, LLC ER06-736-000 Midway Sunset Cogen 5/1/1989 CISO Southwest 1989-05 52169 A 78.00 78.00
SR Hazlehurst, LLC ER06-736-000 Midway Sunset Cogen 5/1/1989 CISO Southwest 1989-05 52169 B 78.00 78.00
SR Hazlehurst, LLC ER06-736-000 Midway Sunset Cogen 5/1/1989 CISO Southwest 1989-05 52169 C 78.00 78.00
SR Hazlehurst, LLC ER02-2309-000 Whitewater Hill Wind Partners 1/1/1960 CISO Southwest 2002-10 56012 1 61.50 61.50
SR Hazlehurst, LLC ER02-1695-000 Cabazon Wind Partners 1/1/1960 CISO Southwest 2002-10 56011 V-47 41.00 41.00
SR Hazlehurst, LLC ER13-2490-001 Simon Solar Farm LLC SOCO Southeast 2013-11 58628 SRSSF 30.00 30.00
SR Hazlehurst, LLC ER17-311-000 Hazlehurst II 12/1/2016 SOCO Southeast 2016-12 60554 STHLV 52.50 52.50
SR Hazlehurst, LLC ER17-1742-000 Hattiesburg Solar Farm 10/21/2017 SOCO Southeast 2017-10 60552 HATTI 50.00 50.00
SR Hazlehurst, LLC ER19-53-000 Millington Solar Farm TVA Southeast 2018-12 60560 MILL 53.00 53.00
SR Hazlehurst, LLC ER19-2671-000 SR Arlington II 11/1/2019 SOCO Southeast 2019-11 62367 ARLII 102.50 102.50 SR Arlington II, LLC as the owner of the Arlington II facility, leases the facility to SR Arlington II MT, LLC. SR Arlington II MT, LLC operates the Arlington II facility, and SR Arlington II, LLC retains title to and sells the output of the Arlington II facility. Capacity listed is based on 2019 EIA data; 139.66 MW, which reflects MWdc rating, was used in MBR application.
SR Hazlehurst, LLC ER19-2670-000 Meridian III 11/7/2019 SOCO Southeast 2019-12 62163 MRDII 75.00 75.00 System controls in place at the facility limit maximum net power production capacity to 52.5 MW.
SR Hazlehurst, LLC ER19-2672-000 SR Arlington II SOCO Southeast 2019-11 62367 ARLII 102.50 102.50
SR Hazlehurst, LLC ER19-2595-000 Hazlehurst III SOCO Southeast 2019-12 62057 HZIII 40.00 40.00
SR Hazlehurst, LLC ER20-1073-000 SR Terrell 7/8/2020 SOCO Southeast 62058 TERRL 105.00 105.00
SR Hazlehurst, LLC ER20-2663-000 Snipesville SOCO Southeast 62165 SNIPE 120.00 120.00
SR Hazlehurst, LLC ER20-2455-000 SR Platte Solar Farm PSCO Northwest 2017-11 61462 PV1 16.00 16.00
SR Hazlehurst, LLC ER20-2512-000 Baxley 12/16/2020 SOCO Southeast 2020-12 64211 BAXLY 32.00 32.00 SR Baxley, LLC leases its facility to SR Georgia Portfolio I MT, LLC, which operates the facility.  SR Baxley, LLC takes title to and sells the output of the Baxley facility.
SR Hazlehurst, LLC ER20-2510-000 SR Odom 11/6/2020 SOCO Southeast 63814 ODOM 24.00 24.00 Odom Solar, LLC leases its facility to SR Georgia Portfolio I MT, LLC, who operates the facility.  Odom Solar, LLC takes title to and sells the output of the Odom facility.
SR Hazlehurst, LLC ER20-2515-000 SOCO Southeast 24.00 24.00
SR Hazlehurst, LLC ER20-2515-000 SOCO Southeast 32.00 32.00
SR Hazlehurst, LLC ER20-2595-000 SR Rattlesnake PSCO Northwest 64152 SNAKE 7.20 7.20
SR Hazlehurst, LLC ER21-1259-000 Coso Battery Storage 3/29/2022 CISO Southwest 63943 61730 60.00 60.00
SR Hazlehurst, LLC ER21-2001-000 Shell Polymers Monaca 2/1/2022 PJM Northeast 2022-02 279.00 279.00
SR Hazlehurst, LLC ER21-2408-000 SR Lumpkin SOCO Southeast 64191 LUMP 140.00 140.00
SR Hazlehurst, LLC ER21-2409-000 SOCO Southeast 152.40 152.40
SR Hazlehurst, LLC ER21-2406-000 Lancaster Solar GA 10/20/2021 SOCO Southeast 64150 LANCR 112.00 112.00 The Lancaster facility is owned by a passive owner-lessor and is controlled by Lancaster Solar under a sale-leaseback arrangement. The Lancaster facility's FERC Asset ID was created using the anticipated in-service date.
SR Hazlehurst, LLC ER21-2407-000 SOCO Southeast 140.00 140.00
SR Hazlehurst, LLC ER21-2407-000 SOCO Southeast 152.40 152.40
SR Hazlehurst, LLC ER21-2638-000 SR Perry SOCO Southeast 64151 PERRY 84.00 84.00
SR Hazlehurst, LLC ER22-734-000 SR Arlington I SOCO Southeast 62436 ARLI 24.00 24.00
SR Hazlehurst, LLC ER22-2028-000 SR Hazlehurst 11/30/2015 SOCO Southeast 2015-11 59535 HAZLE 29.79 29.79 The Hazlehurst I Facility is listed with a 20 MW nameplate capacity in EIA data. 29.79 MW reflects the nameplate capacity post-expansion, which is expected to be completed on August 4, 2022, of the Hazlehurst I Facility.
SR Hazlehurst, LLC ER22-1777-001 Madison Fields 4/27/2022 PJM Northeast 2023-12 180.00 180.00
SR Hazlehurst, LLC ER22-1779-001 Marion County Solar 4/27/2022 PJM Northeast 2024-06 100.00 100.00
SR Hazlehurst, LLC DeSoto I Facility 7/14/2022 SOCO Southeast 2022-09 177.44 177.44 SR DeSoto I, LLC will lease its facility to SR DeSoto I Lessee, LLC , who will operate the facility. Facility's rating at the point of interconnection is 125 MW.
SR Hazlehurst, LLC SOCO Southeast 149.76 149.76
SR Hazlehurst, LLC Cedar Springs Facility 7/14/2022 SOCO Southeast 2022-10 98.94 98.94 Facility's net output at the point of interconnection is 70 MW
SR Hazlehurst, LLC Bell Buckle Facility 7/14/2022 TVA Southeast 2022-11 46.91 46.91 Facility's rating at the point of interconnection is 35 MW
SR Hazlehurst, LLC McKellar Facility 7/14/2022 TVA Southeast 2022-11 87.76 87.76 SR McKellar, LLC will lease its facility to SR McKellar Lessee, LLC , who will operate the facility. Facility's rating at the point of interconnection is 70 MW.
SR Hazlehurst, LLC TVA Southeast 87.76 87.76
SR Hazlehurst, LLC Turkey Creek Facility 7/14/2022 PJM Northeast 2022-10 69.60 69.60 Facility's rating at the point of interconnection is 50 MW
SR Hazlehurst, LLC SOCO Southeast 177.44 177.44
Security and Privacy Statement
For any issues regarding MBR System, please contact MBR support   Please include a current e-mail address. Last Modified: 5/22/2025 5:28:22 PM      ver. 1.58

This site contains information collections that are subject to the Paperwork Reduction Act (PRA). Among other things, the PRA requires FERC to provide you with an estimate of the average burden of completing the information on this site. Comments regarding the burden estimate or any other aspect of these forms can be directed to FERC's Information Collection Branch at DataClearance@ferc.gov.
In addition, you are not required to respond to any collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. FERC provides the OMB Control Numbers of the information collections on this site at www.ferc.gov/information-collections.