MBR | PSSDetails
Emblem for the Federal Energy Regulatory Commission

MBR Portal

Federal Energy Regulatory Commission

FERC.GOV    LOGIN    
Home
Create GID
Create Gen Assets
Submit MBR XML
MBR Reports
Documents and Links

PSS Report


MBR Pivotal Supplier Screen Details

1336685
Uniper Global Commodities North America
SWPP Base Case
2019 C003576
Study Parameter Study Parameter Value Study Parameter Reference
Seller and Affiliate Capacity (owned, controlled)
Seller Installed Capacity 0.00
Seller Remote Capacity 0.00
Seller LT Firm Purchases From Inside 300.00 Green Country SPP and MS SPP Contract
Seller LT Firm Purchases From Outside 0.00
Seller LT Firm Sales 0.00
Seller Uncommited Capacity Imports 0.00
Non-Affiliate Capacity
Non-Affiliate Installed Capacity 90,355.00 (South Power Pool, Inc., Supplement to Informational Filing of 2021 Simultaneous Import Limit Study for SPP Region, Docket No. AD10-2-014 (filed September 21, 2021)) - Row 3
Non-Affiliate Remote Capacity 0.00 Assumed 0
Non-Affiliate LT Firm Purchases from Inside 0.00 Assumed 0
Non-Affiliate LT Firm Purchases from Outside 5,325.00 South Power Pool, Inc., Supplement to Informational Filing of 2021 Simultaneous Import Limit Study for SPP Region, Docket No. AD10-2-014 (filed September 21, 2021)
Non-Affiliate LT Firm Sales 6,019.00 South Power Pool, Inc., Supplement to Informational Filing of 2021 Simultaneous Import Limit Study for SPP Region, Docket No. AD10-2-014 (filed September 21, 2021)
Non-Affiliate Uncommitted Capacity Imports 0.00 Accepted SIL is zero. Southwestern Pub. Serv. Co., 166 FERC ¶ 61,054 (2019). SPP Data filed in Sept. 2021 includes negative SIL values.
Study Area Reserve Requirements 1,338.00 South Power Pool, Inc., Supplement to Informational Filing of 2021 Simultaneous Import Limit Study for SPP Region, Docket No. AD10-2-014 (filed September 21, 2021)
Reserve Requirements Attributable to Seller 0.00
Total Uncommitted Supply 44,626.00
Load
Study Area Peak Load 50,866.00 South Power Pool, Inc., Supplement to Informational Filing of 2021 Simultaneous Import Limit Study for SPP Region, Docket No. AD10-2-014 (filed September 21, 2021)
Average Daily Peak Native Load in Peak Month 43,997.00 South Power Pool, Inc., Supplement to Informational Filing of 2021 Simultaneous Import Limit Study for SPP Region, Docket No. AD10-2-014 (filed September 21, 2021)
Amount of Average Daily Peak Native Load Attributable to Seller 0.00
Wholesale Load 6,869.00
Net Uncommitted Supply 37,757.00
Seller Uncommitted Capacity 300.00
Result (0 for Fail, 1 for Pass) 1
Total Imports 0.00
Seller Percent of SIL 0.00
Non-Affiliate Percent of SIL 0.00
SIL Value 0.00 Accepted SIL is zero. Southwestern Pub. Serv. Co., 166 FERC ¶ 61,054 (2019). SPP Data filed in Sept. 2021 includes negative SIL values.
SIL Limit Exceeded (0 for No, 1 for Yes) 0

Security and Privacy Statement
For any issues regarding MBR System, please contact MBR support   Please include a current e-mail address. Last Modified: 2/22/2024 5:16:28 PM      ver. 1.54

This site contains information collections that are subject to the Paperwork Reduction Act (PRA). Among other things, the PRA requires FERC to provide you with an estimate of the average burden of completing the information on this site. Comments regarding the burden estimate or any other aspect of these forms can be directed to FERC's Information Collection Branch at DataClearance@ferc.gov.
In addition, you are not required to respond to any collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. FERC provides the OMB Control Numbers of the information collections on this site at www.ferc.gov/information-collections.