MBR | MSS Details
Emblem for the Federal Energy Regulatory Commission

MBR Portal

Federal Energy Regulatory Commission

FERC.GOV    LOGIN    
Home
Create GID
Create Gen Assets
Submit MBR XML
MBR Reports
Documents and Links

MSS Report


MBR Market Share Screen Details

1284948
Heartland Generation Ltd.
BPAT Base Case
2017 C002860
Study Parameter Winter(MW) Spring(MW) Summer(MW) Fall(MW) Study Parameter Reference
Seller and Affiliate Capacity (owned, controlled or under LT contract)
Seller Installed Capacity 648.00 615.00 615.00 615.00 Generation Generation Generation Generation
Seller Remote Capacity 0.00 0.00 0.00 0.00
Seller LT Firm Purchases From Inside 0.00 0.00 0.00 0.00
Seller LT Firm Purchases From Outside 0.00 0.00 0.00 0.00
Seller LT Firm Sales 0.00 0.00 0.00 0.00
Seller Seasonal Planned Outages 0.00 0.00 0.00 0.00
Seller Uncommited Capacity Imports 0.00 0.00 0.00 0.00 SIL is zero SIL is zero SIL is zero SIL is zero
Capacity Deductions
Study Area Average Peak Native Load 8,678.00 6,882.00 7,074.00 6,740.00 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8
Amount of Average Peak Native Load Attributable to Seller 0.00 0.00 0.00 0.00
Amount of Average Peak Native Load Attributable to Non-Affiliates 8,678.00 6,882.00 7,074.00 6,740.00
Study Area Reserve Requirements 774.00 620.00 538.00 610.00 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8
Amount of Study Area Reserve Requirements Attributable to Seller 0.00 0.00 0.00 0.00
Amount of Study Area Reserve Requirements Attributable to Non-Affiliates 774.00 620.00 538.00 610.00
Non-Affiliate Capacity (owned, controlled or under LT contract)
Non-Affiliate Installed Capacity 16,225.00 17,980.00 15,396.00 13,276.00 Idaho Power Triennial, Exhibit EK-8 plus Wheatridge Solar less Row A Idaho Power Triennial, Exhibit EK-8 plus Wheatridge Solar less Row A Idaho Power Triennial, Exhibit EK-8 plus Wheatridge Solar less Row A Idaho Power Triennial, Exhibit EK-8 plus Wheatridge Solar less Row A
Non-Affiliate Remote Capacity 11.00 8.00 5.00 8.00 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8
Non-Affiliate LT Firm Purchases from Inside 0.00 0.00 0.00 0.00 Offset Row C Offset Row C Offset Row C Offset Row C
Non-Affiliate LT Firm Purchases from Outside 0.00 0.00 0.00 0.00
Non-Affiliate LT Firm Sales 2,425.00 2,486.00 2,471.00 2,318.00 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8
Non-Affiliate Seasonal Planned Outages 0.00 1,613.00 0.00 0.00 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8 Idaho Power Triennial, Exhibit EK-8
Non-Affiliate Uncommitted Capacity Imports 0.00 0.00 0.00 0.00 SIL is zero SIL is zero SIL is zero SIL is zero
Supply Calculations
Total Competing Supply 4,359.00 6,387.00 5,318.00 3,616.00
Seller Uncommitted Capacity 648.00 615.00 615.00 615.00
Total Seasonal Uncommitted Capacity 5,007.00 7,002.00 5,933.00 4,231.00
Seller Market Share 12.90 8.80 10.40 14.50
Result (0 for Fail, 1 for Pass) 1 1 1 1
Total Imports 0.00 0.00 0.00 0.00
Seller Percent of SIL 0.00 0.00 0.00 0.00
Non-Affiliate Percent of SIL 100.00 100.00 100.00 100.00
SIL Value 0.00 0.00 0.00 0.00 Puget Sound Energy, Inc., Docket No. ER17-20599-004 (July 10, 2020) (delegated order) Puget Sound Energy, Inc., Docket No. ER17-20599-004 (July 10, 2020) (delegated order) Puget Sound Energy, Inc., Docket No. ER17-20599-004 (July 10, 2020) (delegated order) Puget Sound Energy, Inc., Docket No. ER17-20599-004 (July 10, 2020) (delegated order)
SIL Limit Exceeded (0 for No, 1 for Yes) 0 0 0 0


Security and Privacy Statement
For any issues regarding MBR System, please contact MBR support   Please include a current e-mail address. Last Modified: 2/22/2024 5:16:28 PM      ver. 1.54

This site contains information collections that are subject to the Paperwork Reduction Act (PRA). Among other things, the PRA requires FERC to provide you with an estimate of the average burden of completing the information on this site. Comments regarding the burden estimate or any other aspect of these forms can be directed to FERC's Information Collection Branch at DataClearance@ferc.gov.
In addition, you are not required to respond to any collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. FERC provides the OMB Control Numbers of the information collections on this site at www.ferc.gov/information-collections.