1324887
CA Flats Solar 130, LLC
LDWP Base Case
2020 C005401
Study Parameter Winter(MW) Spring(MW) Summer(MW) Fall(MW) Study Parameter Reference
Seller and Affiliate Capacity (owned, controlled or under LT contract)
Seller Installed Capacity 340.00 340.00 340.00 340.00 Generation Generation Generation Generation
Seller Remote Capacity 0.00 0.00 0.00 0.00
Seller LT Firm Purchases From Inside 0.00 0.00 0.00 0.00
Seller LT Firm Purchases From Outside 0.00 0.00 0.00 0.00
Seller LT Firm Sales 340.00 340.00 340.00 340.00 Generation Generation Generation Generation
Seller Seasonal Planned Outages 0.00 0.00 0.00 0.00 Conservatively assumed to be zero Conservatively assumed to be zero Conservatively assumed to be zero Conservatively assumed to be zero
Seller Uncommited Capacity Imports 0.00 180.00 0.00 180.00 Uncommitted capacity in first-tier markets if SIL>0 Uncommitted capacity in first-tier markets if SIL>0 Uncommitted capacity in first-tier markets if SIL>0 Uncommitted capacity in first-tier markets if SIL>0
Capacity Deductions
Study Area Average Peak Native Load 3,300.00 3,218.00 4,391.00 3,979.00 Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial
Amount of Average Peak Native Load Attributable to Seller 0.00 0.00 0.00 0.00
Amount of Average Peak Native Load Attributable to Non-Affiliates 3,300.00 3,218.00 4,391.00 3,979.00
Study Area Reserve Requirements 198.00 193.00 263.00 239.00 Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial
Amount of Study Area Reserve Requirements Attributable to Seller 0.00 0.00 0.00 0.00
Amount of Study Area Reserve Requirements Attributable to Non-Affiliates 198.00 193.00 263.00 239.00
Non-Affiliate Capacity (owned, controlled or under LT contract)
Non-Affiliate Installed Capacity 7,793.00 7,635.00 7,635.00 7,635.00 Nevada Power Southwest Region Triennial, less Row A Nevada Power Southwest Region Triennial, less Row A Nevada Power Southwest Region Triennial, less Row A Nevada Power Southwest Region Triennial, less Row A
Non-Affiliate Remote Capacity 2,826.00 2,796.00 2,796.00 2,796.00 Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial
Non-Affiliate LT Firm Purchases from Inside 340.00 340.00 340.00 340.00 Offset Row C Offset Row C Offset Row C Offset Row C
Non-Affiliate LT Firm Purchases from Outside 0.00 0.00 0.00 0.00
Non-Affiliate LT Firm Sales 0.00 0.00 0.00 0.00
Non-Affiliate Seasonal Planned Outages 1,811.00 893.00 234.00 745.00 Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial
Non-Affiliate Uncommitted Capacity Imports 0.00 1,204.00 0.00 1,062.00 Nevada Power Southwest Region Triennial, less Row E above Nevada Power Southwest Region Triennial, less Row E above Nevada Power Southwest Region Triennial, less Row E above Nevada Power Southwest Region Triennial, less Row E above
Supply Calculations
Total Competing Supply 5,650.00 7,671.00 5,883.00 6,870.00
Seller Uncommitted Capacity 0.00 180.00 0.00 180.00
Total Seasonal Uncommitted Capacity 5,650.00 7,851.00 5,883.00 7,050.00
Seller Market Share 0.00 2.30 0.00 2.60
Result (0 for Fail, 1 for Pass) 1 1 1 1
Total Imports 0.00 1,384.00 0.00 1,242.00
Seller Percent of SIL 0.00 13.01 0.00 14.49
Non-Affiliate Percent of SIL 0.00 86.99 0.00 85.51
SIL Value 0.00 1,384.00 0.00 1,242.00 Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial Nevada Power Southwest Region Triennial
SIL Limit Exceeded (0 for No, 1 for Yes) 0 0 0 0


Security and Privacy Statement
For any issues regarding MBR System, please contact MBR support   Please include a current e-mail address. Last Modified: 2/22/2024 5:16:28 PM      ver. 1.54

This site contains information collections that are subject to the Paperwork Reduction Act (PRA). Among other things, the PRA requires FERC to provide you with an estimate of the average burden of completing the information on this site. Comments regarding the burden estimate or any other aspect of these forms can be directed to FERC's Information Collection Branch at DataClearance@ferc.gov.
In addition, you are not required to respond to any collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. FERC provides the OMB Control Numbers of the information collections on this site at www.ferc.gov/information-collections.